Skip to main content

Boiler Explosion Results In $47M Settlements

Boiler Explosion Results In $47M Settlements

Boiler Explosion Results In $47M Settlements

Introduction

The defendant parties in St. Louis announced $47 million settlement over boiler explosion lawsuit filed by injured plaintiffs against them alleging that they failed to include corrosion allowance on the pressure vessel and owners failed to do proper water chemistry treatment, sediment removal, and inspections which resulted in a boiler explosion.

A boiler explosion occurs, and, in 2017, and in April, at the Loy-Lange-Saint-Louis-the property. The explosion drove a single one-ton boiler, by means of the buildings and the roof, sending it down into the laundry room, killing four and injuring three others.

On April 3, 2017, a 3000-pound pressurized steam container exploded at the Loy-Lange Box Company facility on Russell Avenue. The container flew 500 feet high before landing into the Faultless Linen Facility. It resulted in killing one person and injuring two at Loy-Lange, while three or more were killed at Faultless Linen.

Those who died included Kenneth Trentham, who died in the plant, and Clifford Lee, Christopher Watkins, and Tonya Gonzalez-Suarez, who was died when the boiler fell into Faultless Healthcare Linen nearby. Those at the linen organization were starting their first day on the job.

In this case, resulted in four of the trials for the accidental death claims for personal injury or two to recover damages for damage to property to Kickham boiler rooms, and Technology, Chicago Boiler Company, Aquacomp for Water Treatment, the Loy-Lange, and, Incorporated.

Lawsuits were consolidated for trial before Judge Micheal Noble in St. Louis. A two-day mediation was conducted by retired Judge Glenn Norton. During the mediation, plaintiffs reached the settlements with Kickham Boiler and Engineering, Chicago Boiler Company, Aquacomp Water Treatment Services, Loy‐Lange, Clayton Industries, and Arise Incorporated.

According to a local news channel report by KSDK.com, the boiler explosion settlement fixes all of the remaining cases, and resulted in the manufacturers paying $21 million, inspection consultants Arise Incorporated giving $17.5 million, and Loy Lange giving $4 million. The organization that was supposed to do the maintenance of the boiler will give $728,000. The accord comes out of mediation meetings in June 2019.

Even if the settlement of the lawsuit, the case has still left concerns in the St. Louis area after local news channels produced stories, sometimes involving anonymous inspectors, who say the city is not doing proper boiler inspections and maintenance, and that such incidents were inevitable.

Comments

Restricted HTML

  • Allowed HTML tags: <a href hreflang> <em> <strong> <cite> <blockquote cite> <code> <ul type> <ol start type> <li> <dl> <dt> <dd> <h2 id> <h3 id> <h4 id> <h5 id> <h6 id>
  • Lines and paragraphs break automatically.
  • Web page addresses and email addresses turn into links automatically.

Latest News

First Federal Bellwether Trial Set in Strattice Mesh Case

Categories: Hernia Mesh

Lawyers involved in federal Strattice hernia mesh litigation are scheduled to meet with the presiding judge in the U.S. District Court for the District of New Jersey to…

Tepezza Hearing Loss Trial Set for June 2026

Categories: Tepezza

The U.S. District Judge overseeing all federal Tepezza lawsuits has postponed the start of the first bellwether trial by 60 days.

This decision comes as attorneys…

FDA Moves to Restrict Dangerous 7-OH Opioid Products

Categories: Opioids

In a significant move to combat the ongoing opioid crisis, the U.S. Food and Drug Administration (FDA) has recommended a scheduling action under the Controlled Substances Act (CSA) to regulate certain products containing 7-hydroxymitragynine (7-…

✍️ FREE — 2,800 Pages Legal Process Outsourcing Trial!                 
No Contract. No Risk — Full Mass Tort + LPO Access, Free!

Only 10 Firms Accepted—Offer Ends August 31!